Co-manufacturing Components Movement Summary

Some production scenarios have several co-manufacturers in an outsourced supply chain, where components and semi-finished products are passed from one co-manufacturer to another. This report tracks the quantities and stock value moving in and out of each co-manufacturing location.

Please note, transfer of semi-finished products between co-manufacturers off the system, with co-manufacturers informing the merchant when they have sent or received a production operation input/output. The merchant can mark co-manufacturing operations as started or completed in Core, which will record the dates for this report.

Only users with the Production Reporting permission can access this report.

Before you start

Data from this report can be exported in Excel, PDF or RTF format.

Input

Input Description
Reporting period Allows the user to select the reporting period from a list of options or set a custom date range.
Layout Set to the default layout. Allows selection of saved layouts, if any.
Save layout as Allows saving a layout for potential future use.
Reset layout Resets the layout to the default layout or selected saved layout.

Select Apply filter to set filter fields for the report and Update to refresh the output with any new changes. See Managing Cin7 Core Reports - Filtering Reports for more detailed information about using filters.

Output

The following output fields are available for this report. You may have to open the Configure layout menu to add some of them to your report.

Fields

Field Description
Production order # Production order number
Production run # Production run number
Co-man Co-manufacturer connected to operation work center
Work center Work center where co-manufacturing operation takes place
Input/Output Input/output product used in the production process: SKU: Product name
Date Date when semi-finished product was received by co-manufacturer or when semi-finished product was sent to next co-manufacturer. For input products, this is when the co-man operation is started. For output products, when the co-man operation is completed.
Type Type of movement. In or out of the co-manufacturer location.
Location Co-manufacturing location.
Status Production order status.
Operation # Sequential number and name of production operation.
SKU Product SKU
Finished product Name of the production BOM product: SKU: Finished product name. This is the main finished product for which order is created.
Unit Input/output product's unit of measure
Start date Start date of the co-manufacturing operation.
Year Year of the stock movement date.
Quarter Quarter of the stock movement date.
Month Month of the stock movement date.
Component additional attribute 1-10 Additional component attributes and their values.

Data headers

Data header Description
Quantity in Quantity of stock moved into the co-manufacturing location within the selected time period.
Quantity out Quantity of stock moved out of the co-manufacturing location within the selected time period
Cost in Cost of the stock moved into the co-manufacturing location in base currency.
Cost out Cost of the stock moved out of the co-manufacturing location in base currency.

Was this article helpful?

Have more questions? Submit a request