MRP / Production / Demand Location Transfer
There is a lack of function between Production products and then transferring them to their Demand location.
MRP is run on a demand - which is set up in Location Supply Rules. MRP generates the required Production Orders and the later corresponding Draft Transfer from Production back to the Demand Location.
However, Once the Production Orders are created and the Draft Transfer is created, there is no further link between the two. Stock is produced and delivered to the production shop floor and just sits there until the transfer is actioned.
We go through the effort to create a Supply Rule but then the stock isn't actually supplied once it is available.
There is no report linking the information nor is there a notification / visibility to know that the transfer is now able to be actioned.
Maintaining a link, without extra steps!!!, between the MRP Demand Source (i.e. a sales order) and the Production Orders would be a huge advantage, saving time and making the actual process much more efficient.
Related to
Comments
0 comments
Please sign in to leave a comment.